← Backflow review queue
Backflow assembly test · 9075 Laurel Dr
ApprovedFiled Apr 20, 2025 by Riley Nguyen, Clearwater Backflow Testing · filed from phone
Report
- Date of service
- Apr 20, 2025
- Assembly type
- RP
- Serial number
- W601489
- Size
- 3/4
- Test gauge serial
- G-6095
- Gauge calibration date
- Jul 16, 2024
- Check valve 1
- 3.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.1 psid
- Relief valve opened at
- 1.5 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 025-25-01309
- RP relief valve must open at 2.0 psid or more.
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9075 Laurel Dr
Owner: Taylor Stroud
Parcel 025-25-01309