← Backflow review queue
Backflow assembly test · 3273 Cedar Hollow Ln
ApprovedFiled Sep 28, 2023 by Taylor Pruitt, Summit Backflow Testing · filed from phone
Report
- Date of service
- Sep 28, 2023
- Assembly type
- RP
- Serial number
- Z678882
- Size
- 1
- Test gauge serial
- G-1492
- Gauge calibration date
- Jan 20, 2023
- Check valve 1
- 0.6 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 3.1 psid
- Relief valve opened at
- 2.3 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 143-27-01224
- Readings in range, no flags
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
3273 Cedar Hollow Ln
Owner: Cameron Danner
Parcel 143-27-01224