← Backflow review queue
Backflow assembly test · Maple Leaf Medical Offices
Needs reviewFiled Nov 20, 2026 by Casey Fairley, Heritage Backflow Testing · filed from phone
Report
- Date of service
- Nov 20, 2026
- Assembly type
- DC
- Serial number
- Z802682
- Size
- 1
- Test gauge serial
- G-9800
- Gauge calibration date
- Aug 5, 2025
- Check valve 1
- 0.5 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 2.1 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 041-18-01056
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Property
4919 Old Church Trl
Owner: Benton Holdings LLC
Parcel 041-18-01056