← Backflow review queue
Backflow assembly test · Station Brewing Co
ApprovedFiled May 28, 2025 by Jamie Ramirez, Patriot Backflow Testing · filed from phone
Report
- Date of service
- May 28, 2025
- Assembly type
- RP
- Serial number
- A909548
- Size
- 1 1/2
- Test gauge serial
- G-8522
- Gauge calibration date
- Aug 4, 2024
- Check valve 1
- 0.8 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 2.6 psid
- Relief valve opened at
- 2.8 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for backflow tester
- All required fields present
- Address matches parcel 014-33-01208
- Readings in range, no flags
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
1213 Ridgeview Trl
Owner: Hollins Holdings LLC
Parcel 014-33-01208