← Stormwater review queue
Stormwater facility inspection · Riverside Diner
ApprovedFiled Jul 19, 2026 by Jordan Ellery, Valley Engineering · filed from phone
Report
- Date of service
- Jul 19, 2026
- Facility type
- Underground detention
- Sediment accumulation
- 60 % of capacity
- Inlet and outlet clear
- No
- Erosion or embankment damage
- No
- Vegetation maintained
- No
- Maintenance needed
- Remove sediment at forebay; clear outlet trash rack
- Functioning as designed
- No
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file and current for professional engineer
- All required fields present
- Address matches parcel 077-36-01240
- Sediment over 50% of capacity: cleanout needed.
- Blocked inlet or outlet.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by Auto-approved (no flags). The property's next due date is set and the owner gets a receipt.
Property
9598 Cedar Hollow Dr
Owner: Whitcomb Holdings LLC
Parcel 077-36-01240